Case Study: Gastight Doors for a Nuclear Decommissioning Project

Westmoor Engineering set foot in new territory with a project requiring the design, manufacture and test of radiological resistant gastight doors. The customer was a nuclear division of a Tier 1 UK construction conglomerate conducting work on a nuclear decommissioning site in the South East of England.

Download the case study here: Gastight Doors for a Nuclear Decommissioning Project

Comments are closed.